Categories: Coin Shop Blog

Zinc One Signs LOI to Sell 100% of the Esquilache Silver Project in Southern Peru

Zinc One Resources Inc.(TSXV:Z) (OTC Pink: ZZZOF) (FSE:RH33) (Zinc One or the Company) announces that Zinc One has entered into a binding letter of intent (the LOI) with Nubian Resources Ltd. (Nubian) whereby Zinc One has agreed to sell a 100% interest in one of its non-core assets, the Esquilache Silver Project, located in Southern Peru, to Nubian.

Under the terms of the LOI, Nubian paid Zinc One a $25,000 deposit and has agreed to pay $600,000 on closing (the Closing Payment). The Closing Payment will consist of: (i) a minimum of $125,000 in cash and (ii) up to $475,000 in common shares of Nubian calculated on the volume weighted average price (VWAP) for the 60 calendar days preceding the LOI date.

Further, Zinc One will receive four non-refundable annual advanced Net Smelter Royalty (NSR) payments of $162,500. Zinc One will also retain a 2% NSR of which Nubian will have the right to purchase 1% for $500,000 at any time, until the third anniversary of the first sale of gold, silver or concentrate. The parties have agreed to enter into the definitive agreement by November 23, 2017.

Jim Walchuck, Chief Executive Officer of Zinc One stated The proposed sale of the Esquilache Silver Project reiterates management’s plan to focus on the exploration and development of our flagship Bongar Mine and Charlotte-Bongar Zinc-Oxide Projects in north-central Peru and being a ‘pure zinc’ exploration and development company.

Closing of the purchase is subject to a number of conditions including acceptance of the TSX Venture Exchange.

Zinc One Resources

410 1040 W Georgia St, Vancouver BC V6E 4H1

Tel. 604.683.0911

www.zincone.com

About Zinc One Resources Inc.

Zinc One is focused on the acquisition, exploration and development of prospective and advanced zinc projects in mining-friendly jurisdictions. Zinc One’s key assets are the Bongar Mine and Charlotte-Bongar Zinc-Oxide Projects in north-central Peru. The Bongar Zinc-Oxide Mine Project was in production from 2007 to 2008, but shut down due to the global financial crisis and concurrent decrease in the zinc price. Past production included >20% zinc grades and recoveries over 90% from surface and near-surface zinc nonsulfide mineralization. High-grade nonsulfide zinc mineralization is known to outcrop between the mined area and the Charlotte-Bongar Zinc-Oxide Project, which is nearly six kilometres to the NNW and where past drilling intercepted various near-surface zones with high-grade zinc. The Company is managed by a proven team of exploration geologists and engineers who have previously constructed and operated successful mining operations. The technical content of this news release has been reviewed and approved by Bill Williams, COO and Director of Zinc One, a qualified person as defined by National Instrument 43-101

For more information,

please visit the website at www.zincone.com or contact James Walchuck, CEO, President and director at (604) 683-0911 or email at info@zincone.com.

ON BEHALF OF THE BOARD OF DIRECTORS OF ZINC ONE RESOURCES INC.

signed

_______________________

James Walchuck CEO and President

Forward-Looking Statements

Information set forth in this news release contains forward-looking statements that are based on assumptions as of the date of this news release. These statements reflect management’s current estimates, beliefs, intentions and expectations. They are not guarantees of future performance. Zinc One cautions that all forward looking statements are inherently uncertain and that actual performance may be affected by a number of material factors, many of which are beyond their respective control. Such factors include, among other things: risks and uncertainties relating to Zinc One’s limited operating history, its proposed exploration and development activities on the Bongar Zinc Oxide Project and the need to comply with environmental and governmental regulations. Accordingly, actual and future events, conditions and results may differ materially from the estimates, beliefs, intentions and expectations expressed or implied in the forward Zinc One Resources 410 1040 W Georgia St, Vancouver BC V6E 4H1 Tel. 604.683.0911 www.zincone.com looking information. Except as required under applicable securities legislation, Zinc One does not undertake to publicly update or revise forward-looking information.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release

Click here to connect with Zinc One Resources Inc. (TSXV:Z.V) (OTC Pink: ZZZOF) (FSE:RH33) to receive an Investor Presentation.

The post Zinc One Signs LOI to Sell 100% of the Esquilache Silver Project in Southern Peru appeared first on Investing News Network.

admin

Share
Published by
admin

Recent Posts

Wolfden Continues to Hit High-Grade in Deep Drilling at Pickett Mountain

Wolfden Resources (TSXV:WLF) has announced that additional deep drill holes in the company's ongoing infill and…

6 years ago

Gold Set to Soar Above $1,300 – Goldman and Bank of America

Gold Set to Soar Above $1,300 – Goldman and Bank of America – Growing fiscal…

6 years ago

1792 Half Disme Sold For Record Price Of Nearly $2 Million

The finest-known 1792 silver half disme, once in the possession of then-Secretary of State Thomas…

6 years ago

Gold Inches Higher, Silver Ends Near 1-Month High

In precious metals futures action Tuesday, gold and palladium climbed for a second straight session…

6 years ago

1792 Half Disme Sold For Record Price

The finest known 1792 silver Half Disme, once in the possession of then-Secretary of State…

6 years ago

Goldnomics Podcast: Silver Guru, David Morgan: Silver and Gold Will Protect in the Coming Currency Collapse

Goldnomics Podcast: Silver Guru – David Morgan – Silver and Gold Will Protect in the…

6 years ago