Arizona Silver Exploration Inc. Intersects 156 feet (47.5 metres) of 32.4 gpt Silver at Ramsey Silver Project, La Paz County, Arizona
Vancouver, British Columbiaâ(Newsfile Corp. â February 14, 2017) â Arizona Silver Exploration (TSXV:AZS)Â is pleased to announce the second batch of drill results from the first phase of drilling on the Ramsey Silver Project located in La Paz County, Arizona. Drill Results Drill hole R1605-C intersected 156 feet (47.5 metres with approximate true width of 32 metres) containing 32.4 g/tonne (gpt) Ag between 250-406 feet (76-124 metres) depth. R1605-C was a vertical hole. Within this zone is a higher grade grey matrix silica zone 5 feet wide (1.5 metres) containing 280 gpt Ag. The entire intercept is within silicified rhyolite that [...]